  2. Company Production Power
Company Production Power

Yuanyang has established 3 manufacturing workshops, respectively forging workshop, pipe fitting workshop, and flange workshop. The total area of the 3 plants takes up an area of 20 thousand m2. Each year, we produce over 3000 tons of DN15-DN2500 flanges, and more than 2500 tons of pipe fittings.

Workshop

1.Pipe elbow;
2.Cross; fitting;
3.Pipe cap;
4.Eccentric reducer;

5.Slip on flange;
6.Bellows;
7.Blind flange;
8.Pipe tee;

9.Socket weld flange;
10.Standard parts;
11.Straight pipe;
12.Concentric reducer;

13.Socket weld tee;
14.Socket weld elbow

Forging Workshop

Forging workshop mainly produces small or medium diameters of stainless steel flange blanks and forgings. There are 3 principle procedures: cutting, forging and solution treatment.

  • Forging workshop
  • Natural gas furnace
  • 1000-ton friction screw press
  • Die forging hammer
Pipe Fitting Workshop

Here in the pipe fitting workshop, we produce different stainless steel elbows, tees, concentric reducer, eccentric reducer, pipe cap, and flanges. The annual production capacity is up to 2500t. Production process: cutting – molding – solution treatment – shaping – grooving – pickling and passivation

  • Pipe fitting factory
  • CNC cutting equipment
  • Cold forming machine for LT400 pipe elbow
  • 4-post hydraulic press for pipe tees
  • Core unit of hydraulic press
  • Melting furnace
  • Large automatic welding machine
  • Cold extrusion molding machine for pipe tees
Flange Workshop

This workshop is equipped with 30 common lathes for surface treatment of flanges.

  • Flange Workshop
  • Flange Workshop
  • CNC turning center for flanges
  • CNC turning center for flanges
  • CNC flange drilling machine
  • CNC flange drilling machine
  • Dimensional inspection
  • Dimensional inspection
Pipe Fitting Manufacturing Process

1:Procurement of raw materials
2: ATest point A
3: Warehousing of qualified materials
4: Rejection of unqualified materials
5: Feeding
6: Blanking
7: Shot blasting
8: Test point B
9: Gluing

10: Drying
11: Molding
12: Test point C
13: Glue removal
14: Solution treatment
15: Test point D (hardness)
16: Shaping
17: Beveling
18: Test point E

19: Flaw detection
20: Pickling and passivation
21: Cleaning
22: Marking
23: Test point F
24: Packaging
25: Warehousing of finished products
26: Delivery

Raw material procurement: our pipe materials are mainly purchased from some well-known suppliers like Taigang, FROCH, and Wujin Stainless Steel Pipe Group

Quality inspection A: dimension upon the raw pipes and sheets in terms of appearance, dimension, chemical components, and mechanical performance

Stored in warehouse: testing standards for steel sheets: GB 24511, GB/T 4237, ASME SA240/ASTM A240, EN 10028-7; testing standards for steel pipes: GB/T 14976, GB/T 12771, ASME SA312/ASTM A312, EN 10216-5; testing standards for steel bars: GB/T1220, ASME SA276/ASTM A276

Quality inspection B: before the molding process, the pipes having been given shot blasting treatment will be detected for surface

Quality inspection C: detecting the semi-finished products' appearance and surface with test platform, vernier caliper, and height gauge

Quality inspection D (hardness): using hardness tester to check the solid solution effect

Quality inspection E: checking the products' diameter, wall thickness, center height, roundness, appearance and dimension with testing platform, vernier caliper, and height gauge

Quality inspection F: checking whether surface of the finished product is clean, intact or marked correctly

Flange Manufacturing Process

1: Procurement of raw materials
2: Test point A
3: Warehousing of qualified materials
4: Rejection of unqualified materials
5: Feeding
6: Blanking
7: Heating
8: Temperature control
9: Forging

10: Test point B
11: Solution treatment
12: Forging temperature control
13: Test point C (hardness)
14: Machining
15: Test point D
16: Flaw detection
17: Passivation
18: Cleaning

19:Marking
20: Test point E
21: Packaging
22: Warehousing of finished products
23: Delivery

Raw material procurement: steel pipes and bars are mainly from some reliable suppliers like Baosteel and TSS Group

Quality inspection A: here the raw materials are tested for appearance, chemical components, and mechanical performance

Stored in warehouse: testing standards for steel sheets: GB 24511, GB/T 4237, ASME SA240/ASTM A240, EN 10028-7; testing standards for steel pipes: GB/T 14976, GB/T 12771, ASME SA312/ASTM A312, EN 10216-5; testing standards for steel bars: GB/T1220, ASME SA276/ASTM A276

Quality inspection B: checking the forged blanks' dimension and appearance

Quality inspection C (hardness): checking the solution treatment result with hardness tester

Quality inspection D: this step is set to check the machining result with testing platform, vernier caliper, and height gauge. It involves testing the products' caliber, wall thickness, center height, roundness, appearance, and dimension

Quality inspection E: checking whether surface of the finished product is clean, intact or marked correctly

Dongtai Yuanyang Stainless Steel Manufacture Co., Ltd.
Add.: No.1, Dongyuan Road, Qindong Town, Dongtai City, Jiangsu Province, China
Tel.:+86-515-85523809
Fax: +86-515-85520426
Email: fengyp@dtyuanyang.com
Post Code: 224212
Contact person: Ms Yvonne Feng